Commissionning
During commissioning, all inputs and outputs of the PLC are checked
Test of the coherence of the sensors and their scales, the direction of action of the valves, etc.
But A_R_T does not stop at the terminal block of the switch cabinet, in the supply of automated systems and GTC.
The position of the sensors, and actuators, is important in the overall operation.